Category: | Cycleway: A problem that needs to be fixed |
Tags: | bridge, cobweb, kerb, ncn6 |
Date time: | 9.21am, Wednesday 11th December, 2019 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Sheffield |
No proper dropped kerb at the end of the Cobweb Bridge at Sussex Street.
Comments reflect the views of the original submitter only.