Route signs on NCN route 6 and the Cycle Ring Route opposite Sheffield station
Bridge and ramp to NCN route 6, Sheffield
Route sign and new cycleway form NCN routes 6 and 627, Castlegate, Sheffield
Route signs for NCN routes 6 and 627, Sheffield
Stepped connection only between NCN route 6 and this (not very important) cycle bridge
NCN route 6 by the Don in Sheffield
Excellent new streetscape on NCN route 6, Castlegate, Sheffield
Cycle bridge above NCN route 6, Sheffield
Route signs on NCN route 6 and Sheffield's Cycle Ring Route
Route signs and right-turn lanes on NCN route 6 in central Sheffield
Road Closed (to the right), cycle contraflow and right-turn lanes on NCN route 6 in central Sheffield
Two sets of cycle stands in the centre of Sheffield
Possibly the former route of NCN route 6 before the new route was created on Exchange Street
Route signs, cycle stands and excellent new streetscape at the junction of NCN route 6 and the Cycle Ring Route, Castlegate, Sheffield
Cycle stands and excellent new streetscape on NCN route 6 at Castlegate, Sheffield
Route signs and excellent new streetscape at the junction of NCN route 6 and the Cycle Ring Route, Castlegate, Sheffield
Bus and bike gate on Blonk Street bridge (NCN route 6), Sheffield
Excellent new streetscape on Castlegate, Sheffield, with link to NCN route 6
Excellent new streetscape on NCN route 6 at Castlegate, Sheffield
Bike pump by NCN route 6, Castlegate, Sheffield
Excellent new streetscape on NCN route 6 at Castlegate, Sheffield
Crossing on NCN route 6 north from Ponds Forge, Sheffield
NCN route 6 north from Ponds Forge, Sheffield
Cycle crossing on NCN route 6 at Ponds Forge, Sheffield
Discreet sign to the right for NCN route 6 passing beneath the Supertram bridge
Route signs at Ponds Forge, Sheffield
Route signs at the Ponds Forge bridge, Sheffield - NCN route 6 is to the left
Modal filter - turn right to cross Pond Hill at the lights.
NCN route 6 is to the left of the railings
Segregated path on NCN route 6 north from Sheffield station
Wide toucan crossing from NCN route 6 to Sheffield station
Route signs opposite Sheffield station on NCN route 6 and the Cycle Ring Route
The Halfpenny Bridge, built in 2001 for the Trans Pennine Trail (NCN route 6)
Waiting for the toucan crossing across Sheaf Street to change. It did take a while. Across the road is the city's railway station.
Was the budget for the Cobweb Bridge so tight there was no money left for a proper sign at the turn, hence the use of Sustrans stickers?
A 'Cyclists Dismount' sign on the same pole as a sign saying cycling is allowed. Are cyclists only meant to dismount to go around the corner then remount?
The Cobweb Bridge, suspended under the former Sheffield Victoria station viaduct.
No proper dropped kerb at the end of the Cobweb Bridge at Sussex Street.
The lack of a proper dropped kerb at the end of the Cobweb Bridge at #112458 encourages cyclists to use the footway in Sussex Street.
The Cobweb Bridge, under the former Sheffield Victoria station viaduct, looking northeast.
The Cobweb Bridge, under the former Sheffield Victoria station viaduct, looking southwest.
Washed out sand on the ramp down and under the Derek Dooley Way bridge.
Cycling alongside the River Don in Sheffield.
'This way to NCN6' on Furnival Road, which appears to be a shorter way than taking actual NCN6.
'Cyclists Dismount to use Crossing'
The roadworks signage is at least more readable than the tiny permanent sign.
Old cycle facilities and roadworks to create something new.
Poor quality cycle parking on the edge of Sheffield city centre, at Ponds Forge.
A traffic boom across NCN6, with a little gap at the side. Would rising bollards (or even a cheaper padlocked drop bollard) not be more appropriate, leaving more space for those on foot and bike?
A poor transition between two bits of shared footway, and attracting mud. Why is this not on a straight through alignment for cyclists?
A cycleway on the footway at the huge Park Square roundabout, partly obstructed by temporary signs for roadworks.
Cycleway on the footway at the huge Park Square roundabout.
Strange Cycle Lane markings on NCN 6 in Sheffield.
National Cycle Network route 6: Cobweb Bridge
Location: Sheffield (England, United Kingdom)
Rather ingeniously, the route both crosses the River Don and goes under a railway line via this elevated way which gives the feeling that you
NCN6 no special road markings here, other than faded ones.
The road narrowing here is being used as a car park and the cycle lane through that is obviously not working. Lessons to learn here!
Road narrowing and speed cushions
Speed cushions and road narrowing, the narrow cycle lane has disappeared here.
Speed cushions on the NCN6
Good cycle by-pass and traffic calming, but the cycle lane looks a bit narrow.
NCN6 has just entered a residential area.
Riders on the NCN 6 enter the "Child Safety Zone", to that muse mean they're leaving the "Child Danger Zone" ??? ;-)
Toucan crossing on the NCN 6
Erk! These boulders are probably necessary to stop joyriding vehicles but in the dark they're a real threat to the unsuspecting rider.
Cycleway NCN 6 very wide here - there even seems to be a passing place!
I think this may also be the NCN67 too, but not sure.
Cycling and walking signs marked on the NCN67 Trans Pennine Trail
This is two-way for cycling and is expected to become part of NCN 6.